Our most durable odor control mist system.
For permanent installation along property boundaries of landfills, compost sites, sludge drying beds, soil remediation sites, around lagoons and ponds etc.
This system is connected to a water supply. A high pressure pump adds Piian Odor Neutralizer to the water supply and pressurizes the fluid mixture to 1000PSI. The fluid is pumped along hydraulic hoses in which atomization nozzles have been installed. The fluid is released into the environment by the nozzles in a 10 micron droplet mist.
The hoses and nozzles together are referred to as an Atomization Line. The atomization lines are built at the factory and are installed along property perimeters to form a barrier between the source of the odor and the odor complaint. Odors leaving the property perimeter must pass through the barrier and will be destroyed by the system. A single barrier can be as long as 5000FT for our largest system, Multiple systems are used to span longer distances.
- Our most durable fog system for permanent installations on long site boundaries
- A highly visible system
- Built using flexible hydraulic hoses and brass/stainless nozzles
- Majority of hose connections made at factory for installation speed and dependability
- Larger diameter flexible hoses to reduce pressure losses and reduce cost
- Best system for spanning long perimeters with wide uniform nozzle spacing
- 2 year / 10,000 hour warranty, optional lifetime warranty available
- Capable of operating 24 hours per day, 7 days per week
- 1000 PSI Pressure Operation
- 10 Micron fluid droplet size
- No wetting or dripping
- Proven design with industrial quality components
- Industrial duty high capacity skid mounted pump module
- PLC monitor for system conditions and faults
- High capacity water filters
- Stainless steel pump module chassis and cover
- Epoxy painted pump module skid frame
- Fully featured starter panel
- Optional wind speed and direction activation
- Optional environmental condition and equipment status data logging
- Optional SMS error reporting
- Complete project design consultation
- Submittal drawings and documents to professional standards
D2.1.2